Product Name:Auto-climbing Formwork QPMX-50 Product Type:QPMX-50 Product Description:The formwork can climb by itself, without the need of cranes to lift brackets or platforms. It’s the first choice formwork system for construction of highrise buildings and towers. |
The lifting power of the Formwork QPMX-50 comes from its hydraulic system, which includes the oil cylinder and commutator. Through functioning of hydraulic system, the steel rail and bracket can climb up alternately, so the whole formwork system climbs steadily, independent of a crane. It' s easy to operate, and climbing is fast and safe.
Characteristics:
1. One oil cylinder unit can lift 50KN.
2. The QPMX-50 system can climb not only vertically but also slantwise, and the forward or backward inclination can be up to 18 degrees.
3. The system can climb up wholly or separately. The climbing process is steady, synchronous and safe.
4 .The bracket does not come back to the ground until construction work is finished, and spacing for work is reduced while the bumping damage is almost completely prevented, especially for the plywood.
5.The error of structure construction is tiny and easy to correct.
6.The formwork can climb up by itself and cleaning work can be done in situ. The number of crane lifts are greatly reduced.
Standard Climbing Process
1.Set up the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring.
2. Remove the formwork after the first pouring and fix anchor shoes on the finished wall, lift the brackets and formwork to the right position, match the formwork and do the second pouring.
3.Lift formwork and brackets to the higher floor; fix climbing rail and hydraulic system.
4.Match the formwork to the right position and do the third pouring.
5.Strip the formwork and fix anchor shoes on the finished wall, then let the climbing rails climb.
6. Brackets climb up to the right position, then install suspended platform.
7.Match the formwork, do the concrete pouring, and proceed into the standard climbing stage.
Auto-climbing Formwork ZPM-100
The lifting power of Auto-climbing Formwork System ZPM-100 comes from the hydraulic system, which includes the oil cylinder and commutator. The steel rail and the bracket can climb alternately, and therefore the whole formwork system climbs steadily. Cranes are not needed during the construction. It’s easy to operate,highly active and safe. It’s the best choice for construction of high buildings and towers.
Product Name:Auto-climbing Formwork ZPM-100
Product Type:ZPM-100
Product Description:The system can climb by itself. No other equipment is needed when lifting the brackets and platforms.It’s the first choice for concrete pouring of highrise buildings,sush as chimney, bridge and tower.
The lifting power of Auto-climbing Formwork System ZPM-100 comes from the hydraulic system, which includes the oil cylinder and commutator. The steel rail and the bracket can climb alternately, and therefore the whole formwork system climbs steadily. Cranes are not needed during the construction. It’s easy to operate,highly active and safe. It’s the best choice for construction of high buildings and towers.
Characteristics
1-The system is able to climb as a whole or individually, and in a stable way.
2-As the system climbs by itself and cleaning work is done in situ, tower crane lifts are greatly reduced.
3-It’s safe and convenient to operate, and labor and material costs will be greatly slashed.
4-The bracket will not come back to the ground until the construction is finished. Field spacing will be reduced and the bumping damages can be almost prevented, especially for the panels.
5-The climbing process is steady, synchronous and safe.
6-All-purpose platforms are provided, and there is no need to set up additional operation platforms, which means saving the labor and material costs again.
7-There is little margin for error. And if there is, it is simple and easy to correct. Deviations of construction work can be eliminated floor by floor.
8-Fast climbing speed can be achieved, and the construction cycle will be maintained according to schedule.
Auto-climbing Formwork CB-240
Product Name:Climbing Formwork CB-240
Product Type:CB-240
Product Description:The climbing formwork CB-240 is mainly used for the concrete pouring of piers, highrise buildings and so on.
The climbing formwork CB-240 is mainly used in pouring concrete of piers, high buildings, and so on. Because the concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed. The construction is easy, rapid and economical. One single pouring height can be adjusted in a wide range, and the surface of concrete is smooth and durable.
There are two types of climbing units for CB-240, that is, pull-push prop type and truss type. CB-240 of the truss type is suitable for the construction work with heavy bearing load, high altitude formwork installation and relatively small range of adjustable inclination.
Characteristics
1-The load of bracket, formwork and other load during construction are all supported by the anchor system. There is no need to set up scaffolding. It’s suitable for high altitude construction work.
2-One single pouring height can be up to 6 meters, and the formwork unit can move backward 600mm.
3-The formwork can be adjusted horizontally or vertically as requested. The pull-push prop type formwork system can be so adjusted as to lean forward or backward.
4-Couplings are used for the connection of the formwork units, and therefore they will stand in a straight line. All connecting parts are on a high level of standardization and universality.
5-The formwork can stick to the concrete tightly by anchoring set to avoid dislocation and leakage.
Climbing Protection Panel PS-50
Product Name:Climbing Protection Panel
Product Type:PS50
Product Description:The system has a hydraulic system as its source of power, and it can climb by itself, independent of cranes.
Equipped with climbing rail and hydraulic lifting system, the Climbing Protection Panel is able to climb by itself without need of any crane. It provides an enclosure for the whole pouring sections which may cover three floors. As a result, an exclusive working area is formed and protected from wind and bad weathers. Site personnel are secured against falling at all times, and work productivity will be improved significantly due to the increased safety feelings.
The system includes an opening and platform for unloading materials. After slab pouring finishes, it is not necessary to dismantle the formwork units, while instead, they can be removed as an integral part from the opening and lifted to an upper floor for work there, thus saving a lot of labor and material costs as well as speeding up the construction cycle.
A further positive side effect is the large usable advertising area on the outer surface, i. e. the color armor plate illustrated as below. The protection panel can also be tailored to satisfy the needs of the contractors.
The Climbing Protection Panel is a state-of-the-art system which best suits the requirements for a high level of safety in modern construction industry, and in fact, has been applied in a large number of construction projects.
Climbing Formwork PJ-240 & PJ-200
The Concrete Pouring Process The first pouring Before pouring, fix the anchor system on the plywood by M30 position bolt or construction bolt. Reinforce the formwork by wall- through tie rods.
The second pouring(the first lift) Climbing brackets are used in the second pouring. Fix the anchor shoe in the bowl-climbing cone by tensile bolt, hang the bracket on the anchor shoe, and then insert the safe pin.
The third pouring(the second lift) Fix suspended platform under the climbing bracket. Workers can remove the tensile bolt, anchor shoe and bowl-climbing cone for reusing, and then fill the holes left by bowl-climbing cone. This pouring process is the standard pouring; the later lifting process is the same, till the concrete pouring is finished.
Product Name:Climbing Formwork Product Type:PJ-200&240 Product Description:The climbing formwork PJ200 & 240 are widely used in the concrete pouring of piers, high-rise buildings, and so on. |
Introduction
The cantilever climbing formwork PJ200 & PJ240 are widely used in concrete pouring of piers, high-rise buildings, and a variety of other structures.
The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods. Therefore, additional reinforcement is not needed. The construction is easy, rapid and economical, and the surface of the concrete is slick.
The biggest advantage of PJ series is light in weight and convenient in use. The operation platform width of PJ200 and PJ240 is 200cm and 240cm respectively.
The Characteristics
The formwork unit can move backwards up to 600mm.
The formwork is flexible to adjust from all directions.
The inclination can be adjusted by pull-push prop and is up to 18°.
Reasonable structure and light weight.
High level of universality and standardization for connection components.
Climbing Formwork DXB-180 & DXB-240
The Adjustment Of Inclination (DXB-180 system can be inclined by adjusting pull-push prop.The maximum angle is 30°)
Product Name:Climbing Formwork
Product Type:DXB-180&240
Product Description:The climbing formwork DXB-180&240 are mainly used in concrete pouring of dam, pier, guy anchor, concrete protecting wall, tunnel, and underground workshop, etc.
Introduction
Single-side climbing formwork DXB-180 & DXB-240 are based on the DP-180 & DP-240
system, which are in similar structure. DXB-180 & DXB-240 are mainly used in concrete
pouring of dam, pier, guy anchor, concrete protecting wall, tunnel, underground workshop and so
on. Because the concrete lateral pressure is entirely supported by anchor system and bracket, the
wall-through tie-rods and additional reinforcement are not needed. The construction is easy,
rapid and economical; the surface of the concrete is smooth. They are perfect formwork systems
for single-sided walls.
Characteristics
1. The lateral pressure of the concrete is entirely supported by the anchor system. Hence, wallthrough
tie-rods are not needed, and the finished concrete is perfect.
2. The formwork can move backward entirety, which will be convenient for work.
3.Couplings are used for connecting the formwork units to make sure they keep a straight line.
4. The connecting components have a high level of standardization and universality.
5. The formwork can stick to the concrete tightly, which means dislocation and leakage can be
avoided.
6. The formwork can be adjusted horizontally or vertically whenever it is necessary.
7. DXB-180 system can be adjusted to lean forward or backward, and the maximum inclination
is 30°.
Climbing Formwork GJ-190
Conical Installation Type
Cylindrical Installation Type
Product Name:Climbing Formwork
Product Type:GJ190
Product Description:Climbing bracket GJ190 is mainly used as operating platform during construction. It can be used in the vertical wall and arced wall as well.
Introduction
Climbing bracket GJ190 is mainly used as operating platform during construction. It can be used in the vertical wall and arced wall. The bracket hangs on the anchor system which is the supporting system during construction. It’s easy to assemble and disassemble, and the construction is easy , rapid and economical.
The folding climbing bracket is easy to assemble and disassemble, and concvenient for storage, transportation and reusing.
The system can also be used as climbing formwork in the concrete pouring of vertical or arced wall. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, so additional reinforcement is not needed. The construction is easy, rapid and safe.
The Characteristics
1. The loads of bracket, formwork as well as other loads during construction are completely supported by the anchor system. There is no need of scaffolding. It’s suitable for construction of projects in high altitude.
2 .The climbing bracket could be folded , and It is convenient to assemble, save and reuse.
3 .The formwork can lean forward or backward by adjusting the pull-push prop, and it can reach an inclination of 18 degrees at most.
4 .All connectors are on a high level of standardization and universality.
5. All components are connected in an assembling way, which is convenient, flexible and reliable.
6 .Long and short pull-push props work together to adjust the formwork in veritcal direction.
7. It can be applied for supporting arced formwork or panel formwork, on a case-by-case basis according to the design.
Shaft Platform JTPT
Product Name:Shaft Platform
Product Type:JTPT
Product Description:The shaft platform is mainly used in concrete pouring of elevator well, equipment well, stair well of high-rise buildings and so on.
Introduction
The shaft platform is mainly used in concrete pouring of elevator well, equipment well, stair well of high-rise buildings and so on. Concrete lateral pressure is entirely supported by wall-through tie-rods, and no other reinforcement is required. The construction is easy, rapid and economical.
The shaft platform is mainly made up of platform board, timber beam,beam clamp,shaft beam and anchor system.
L is the length of timber beam. W varies from 1.45m to 5.9m. The shaft beam is in a variety of specifications to fit the shaft's dimension.
The formwork and the shaft platform are lifted respectively, first the formwork and then the platform. When the formwork is in position, it is necessary to keep the pawl for shaft beam tightly locked with the tensile bolt.
In order to provide enough movable space for the lifting of platform, some distance from the platform edge to the concrete surface should be kept.
Shaft platform must work together with other formwork systems in construction.
Characteristics
1.The system has a steady structure and connecting components with a high level of universality and standardization. It is also easy to operate.
2. The construction loads are supported by anchor system and therefore scaffolding is not needed. It is suitable for corewall concreting of high-rise buildings.
3. Various specifications as well as length adjustability can fit in with various dimensions of the core tube.